AZ Department of Emergency and Military Affairs, DEMA Picacho Navigation Beacon Installation, Picacho, AZ
Provided all labor, materials, supervision, tools, equipment, scaffolding, hoisting, etc., to deliver electrical services. KA performed all excavating for foundation and conduit run to nearest junction box, formed and poured foundation for light pole, supplied all PVC conduit, #8 wiring , wiring boxes, circuit breakers, and miscellaneous wiring hardware to connect nearest junction box to light beacon, developed and supplied dust control plan, and supplied (1) 55’ tilt down pole.
Kirtland AFB, Giant Voice System, Kirtland AFB, NM
Provided all labor, materials, supervision, tools, equipment, and hoisting to deliver and install outdoor mass notification systems. Work included temp fencing around pole sites, drill holes, prestressed concrete poles, dig permitting, unload and set poles, equipment mounting, system equipment, and testing.
CBP, Papago Farms, Forward Operating Base Renovations, Sells, AZ
Provided all labor, materials, supervision, tools, equipment, scaffolding, hoisting, etc., to deliver and install site utilities, exterior lighting, comm pathway, security camera poles, new lighting and circuits in multiple buildings, and fire alarm.
WAPA, DSW Pinnacle Peak Substation Upgrades, Maricopa, AZ
Provided all labor, materials, supervision, tools, equipment, scaffolding, hoisting, etc., to complete the following work at the Pinnacle Peak substation: grounding upgrades, new risers from trenches, grounding continuity certification, and ATS switch gear installation.